Post a jobLog in

Test Team Manager

Burnfoot, Ireland

Key facts

How you apply
Employer site, account needed
Seniority
Manager/Director
Work mode
On-site

Free account · No card required

About this role

Job Description

The Campsie and Burnfoot Test Team Manager leads the safe, capable and consistent execution of electrical testing across both sites. The role is accountable for test-team safety, people leadership, capacity, operational delivery, execution compliance, test records, equipment readiness, competence and the integrity of pass/fail decisions.

The role protects the customer and the business by ensuring that only authorised personnel use approved methods and calibrated equipment, that test results are complete and traceable, and that abnormal conditions are stopped and escalated without delivery pressure weakening safety or acceptance standards. The manager works closely with Operations, Engineering, Quality, Project Management and customers while preserving independent test judgement. Engineering retains ownership of test definitions, technical methods, limits and non-standard requirements; Operations retains ownership of build quality and production readiness; the Test function owns controlled execution and objective evidence.

Key Responsibilities

  • Lead the Campsie and Burnfoot Test Teams through clear site supervision, team-lead accountability and consistent daily management across shifts.
  • Own safety, quality, delivery, cost and people performance for the test function, with electrical safety and credible product risk taking priority over schedule pressure.
  • Ensure only trained, assessed and authorised personnel perform each category of LV or MV testing; maintain a live competence and authorisation matrix with defined renewal and reassessment requirements.
  • Plan and balance workload, staffing, shift coverage and specialist capability across both sites using demand, product mix, test complexity, customer-witness requirements and available capacity.
  • Chair test tier reviews and maintain visible control of planned workload, readiness constraints, staffing, equipment status, failures, retests, overdue records and escalations.
  • Confirm test readiness before work starts, including approved drawings and test instructions, correct product configuration, required customer documentation, safe test area, competent resources and available calibrated equipment.
  • Ensure routine and customer-specific testing is executed to the approved sequence and acceptance criteria, including applicable functional checks, insulation resistance, dielectric/flash, ductor or main-circuit resistance, primary injection, secondary injection, protection settings, interlocks and mechanical operation.
  • Own execution compliance and the integrity of pass/fail decisions. Stop or hold testing and prevent progression where safety, test readiness, evidence, calibration, competence, acceptance criteria or product conformity is not assured.
  • Ensure test books, scripts, FAT records, certificates, protection settings, measurement results, witness sign-offs and release evidence are completed accurately, contemporaneously and traceably.
  • Lead customer and third-party witness testing in a controlled, professional manner, coordinating readiness and communication without permitting customer or schedule pressure to bypass approved requirements.
  • Ensure failed tests, defects and abnormal results are made safe, contained, technically described and escalated. Control repair, authorised disposition and full retest or defined regression testing before acceptance.
  • Use defect, retest, delay and downtime data to separate product defects from test-system, documentation, equipment, readiness and capability losses; drive accountable corrective action with the responsible functions.
  • Partner with Engineering and AME to maintain controlled test methods, resolve technical ambiguity, improve testability and validate changes to test programmes, fixtures, software and equipment before deployment.
  • Partner with Quality to support NCR, 8D and root-cause activity, verify effectiveness and feed recurring failure modes into PFMEA, control plans, standard work, training and lessons learned.
  • Own test equipment inventory, calibration visibility, preventative maintenance, software/configuration control, safe use, breakdown escalation, spares strategy and capital-investment priorities.
  • Develop the Test Team Supervisors, Team Leads, Test Engineers, Technicians and Administrators through clear objectives, coaching, practical competence assessment, succession planning and fair performance management.
  • Standardise critical test processes, records, competency requirements, escalation rules and KPIs across Campsie and Burnfoot while recognising controlled product- or site-specific differences.
  • Develop and maintain leader standard work, daily/weekly/monthly management routines, resource plans, role profiles and escalation routes that sustain reliable performance.
  • Provide concise reporting to Quality and site leadership on safety, workload, capacity, test FPY, failures, retest hours, downtime, documentation readiness, calibration, competence, customer/FAT issues and investment needs.
  • Escalate without delay any unsafe condition, unauthorised test or release, expired calibration, missing acceptance criteria, unresolved high-risk failure, falsified or incomplete test evidence, or credible customer escape.

Key Interfaces & Decision Authority

  • Business Unit / Plant Quality Leadership: Aligns test governance, customer protection, priorities, resources, risk and escalation.
  • Operations / Planning: Aligns production readiness, workload, schedule and capacity while retaining independent test decisions.
  • Design Engineering / AME / Test Engineering: Owns test definitions, methods, limits, technical changes and disposition support.
  • Project Management / Customer Teams: Coordinates FAT readiness, customer requirements, witness activity, records and commitments.
  • EHS / Facilities / Maintenance: Aligns electrical safety controls, test-area suitability, equipment condition and statutory or company requirements.
  • HR / Learning & Development: Supports recruitment, workforce planning, competence development, succession and performance processes.
  • Decision Authority
  • Can stop or suspend testing, place equipment on hold and prevent progression or release when safety, conformity or required evidence is not assured.
  • Can refuse test readiness, pass/fail acceptance or customer witness activity where approved requirements, competent resources, equipment status or documentation are incomplete.
  • Can require documented technical review, authorised disposition, corrective action and defined retest before acceptance.
  • Can allocate and rebalance test resources between Campsie and Burnfoot in line with approved business priorities, competence and safe working arrangements.
  • Can escalate unresolved safety, technical, customer, compliance, resource or equipment risk through the approved governance route.
  • Cannot independently define or change design acceptance criteria, approve technical concessions, alter test limits or release nonconforming product unless formally authorised.

KPIs / Success Measures

  • Zero harm and full compliance with electrical-safety controls, authorised working and test-area rules.
  • Test first-pass yield, failure rate and repeat-test rate by product family and site.
  • Retest hours, test downtime and lost capacity by cause, including production readiness, documentation, equipment and resource constraints.
  • On-time test completion against the agreed plan and customer/FAT commitments.
  • Test-book and FAT-documentation right-first-time completion, traceability and closure.
  • Competence and authorisation coverage for required LV, MV, protection and customer-specific test activities.
  • Calibration and preventative-maintenance compliance, equipment availability and breakdown response.
  • Test-related NCRs, customer escapes, repeat failures, corrective-action ageing and verified effectiveness.
  • Test-related COPQ, rework and capacity loss, with Finance validation where required.
  • Employee development, succession coverage, retention, attendance and completion of agreed capability plans.
  • Adherence to leader standard work, tier review cadence and horizontal deployment of lessons learned.

EHS & Compliance Accountabilities

  • Comply fully with Vertiv EHS requirements, site rules, electrical-safety controls, PPE requirements, safe systems of work and applicable statutory obligations at both locations.
  • Ensure test areas are controlled, access is restricted, barriers and warning systems are effective, stored energy is managed and emergency arrangements are understood before energisation or high-energy testing.
  • Ensure test equipment is suitable, approved, maintained and within calibration, and that defective or suspect equipment is removed from service.
  • Ensure personnel are practically competent and formally authorised for the test activity and voltage level they perform; training attendance alone is not sufficient.

Your next opportunity starts here

Prepare, apply, track, interview and get hired — all from one platform, with AI in your corner.

Download app

Or sponsor Premium for someone who's job hunting →