About this role
Description
-
The
-
SCADA Implementation Project Manager is responsible for leading, planning,
-
and executing the full lifecycle implementation of a new Supervisory
-
Control and Data Acquisition (SCADA) platform.
-
This
-
includes managing the transition and cutover from the existing legacy
-
SCADA system to the new solution, ensuring continuity of operations, data
-
integrity, and compliance with cybersecurity and regulatory standards. The
-
Project Manager will coordinate cross-functional teams, vendors,
-
integrators, and operational partners to deliver a secure, resilient, and
-
fully validated system.
-
Key
Responsibilities
-
Develop
-
and manage the end‑to‑end project plan for SCADA system replacement,
-
including scope, schedule, budget, risk, and quality targets.
-
Lead
-
project governance activities in alignment with PMO standards, including
-
status reporting, risk and issue management, and stakeholder
-
communication.
-
Coordinate
-
requirements gathering and ensure both current-state and future-state
-
operational needs are captured to enable successful migration and cutover.
-
Oversee
-
all activities related to transitioning from the legacy SCADA system,
-
including data migration, point‑to‑point verification, interface mapping,
-
and operational continuity planning.
-
Develop
-
and manage a detailed cutover strategy, including phased migration,
-
fallback planning, parallel operations (as needed), and post‑cutover
-
validation.
-
Manage
-
vendor selection, contracting, and performance, ensuring alignment with
-
cutover milestones, integration requirements, and acceptance criteria.
-
Partner
-
with Engineering, IT, OT, cybersecurity, and field operations to guide
-
system design, network architecture, and regulatory compliance.
-
Direct integration
-
activities such as PLC/RTU upgrades, historian migration, alarm strategy
-
rationalization, and system interoperability testing.
-
Lead
-
system testing cycles including FAT, SAT, end‑to‑end testing, redundancy
-
failover validation, and user acceptance testing.
-
Work
-
with Operations and field teams to develop and execute commissioning
-
plans, operational readiness activities, and training on the new SCADA
-
environment.
-
Drive
-
organizational change management and communication efforts to support a
-
smooth transition from the legacy system.
-
Manage
-
cutover execution, monitor stability during the transition period, and
-
ensure timely resolution of issues.
-
Oversee
-
the handoff to steady-state support, including documentation, warranty
-
tracking, and transition to maintenance teams.
Requirements
-
Mandatory skills:
-
Bachelor’s
-
degree in Engineering, Computer Science, Operations Technology,
-
Information Systems, or a related field (or equivalent experience).
-
5+
-
years of project management experience in industrial automation,
-
utilities, energy, manufacturing, or infrastructure environments.
-
SCADA
-
project experience is required.
-
Proven
-
experience managing SCADA, DCS, or other industrial control system
-
replacement or modernization projects.
-
Demonstrated
-
expertise in system migration, cutover planning, and operational
-
continuity management.
-
Strong
-
understanding of ICS/OT systems, networking, cybersecurity standards, and
-
high‑availability system design.
-
Excellent
-
vendor and contract management skills.
-
Strong
-
communication, leadership, and stakeholder engagement strengths.
-
PMP,
-
Agile, or equivalent project management certification preferred.
-
Key Competencies:
-
Cutover
-
and migration planning
-
Technical
-
depth in SCADA/OT systems
-
Risk
-
mitigation and decision-making
-
Cross-functional
-
leadership
-
Stakeholder
-
and vendor management
-
Clear
-
and proactive communication
-
Change
-
and operational readiness management