Log in
All jobs
M

Connectivity Engineer, Lease - Data Center Construction

Remote, US
RemoteUSD 123,000 - 176,000 / year

About this role

Connectivity Engineer, Lease - Data Center Construction

Remote, US

Data Center Design, Engineering, & Construction

  • 1 more

Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our innovative services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta ’s global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta ’s server banks.

The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally.

Connectivity Engineer, Lease - Data Center Construction Responsibilities

  • Project Planning & Control - Create, maintain, and report on site project and program scope, schedules and milestones. Work closely with site project management team throughout the project lifecycle from the creation of project and program plans through project close out
  • Learnings - Continually review ongoing projects for efficiencies in schedule, budget, and opportunities to enable cross-functional partners to be successful. Document data points to assist with field coordination of projects. Support development of project management best practices and initiatives, coordinating SOPs/SIPs with vendors, and participating in global and regional standards. Coordinate lessons learned with the DEC Center of Excellence
  • Forecasting - Support project controls team with forecasting and budget efforts as required. Share current project status with upstream and downstream partners, ensuring crisp and complete handoffs between teams
  • Technical Reviews - Establish milestones for equipment purchase and track and report against these milestones Assist with the selection and review of a contractor to support the structured cabling work within a data center
  • Metrics - Report progress and risks on site projects and other initiatives to key stakeholders
  • Workflow - Work with installation partners to establish and track milestones. Conduct pre-project planning, project handoffs, and ensure design delivery and verification. Identify and respond to project risks and high-priority issues rapidly and effectively through effective action and appropriate escalation. Track and manage project change order requests
  • Vendor Field Management - Responsible for all connectivity activities (OSP/ISP) within construction, projects on site including tracking and reporting actual progress related to schedule expectations. Set and communicate clear expectations together with the immediate site team, build key relationships with our installation partners and drive best practices, safe working environment and execute to a vision of ‘right first time.’
  • Quality Assurance - Perform physical inspections to ensure vendor work meets DEC quality standards throughout the lifecycle of the data center. Validate physical installs, test reports, build accuracy, material and local code compliance including constructability reviews on multiple design phases
  • Technical Field Lead - Technical lead for industry and Meta standards, responsible to lead product evaluation, design, and installation methods in the field including scope clarification, design and installation details as the owner of the Request for Information process
  • Technical Coordination - Develop solutions to in-field scope-gap or clash issues. Partner with DEC design and engineering teams to digitally support design reviews, BOM reviews, and as-built drawing validations
  • Communications & Cross functional team engagement - Liaise with construction partners to ensure deliverables are met during new builds and retrofits. Coordinate with logistics partners, vendors, and suppliers to ensure a smooth end to end flow of materials as needed. Work closely with the relevant teams to proactively communicate progress and project risks and initiatives to key stakeholders
  • Safety - Ensure that vendors adhere to safety obligations in accordance with local regulations and DEC Safety best practices. Lead a 'safety first' environment, with open and transparent communication. Acknowledging appropriate EHS practices
  • Travel - Position is remote and will require a minimum of 50% travel

Minimum Qualifications

  • 5+ years of experience in project management for data center connectivity, construction, or telecommunications infrastructure
  • Experience engaging and guiding stakeholders
  • Experience providing solutions to construction related problems
  • Experience with Google Workspace

Preferred Qualifications

  • Experience reviewing and leading installations to design documents and specifications
  • Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews)
  • Experience managing IT or IP Network deployment projects in a mission critical environment requiring coordination across multiple disciplines for the delivery of a common goal
  • Experience with outside plant cabling (OSP) deployments including OTDR/OLTS testing
  • Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies
  • Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements)
  • Experience with Primavera 6
  • Experience in leading deployments of Network/Structure cabling infrastructure
  • Experience with fiber optic testing at scale, inclusive of complex troubleshooting
  • Data center development and/or construction management experience
  • Experience with Quality Assurance and Quality Control, including progressive inspections and acceptance

About Meta

Meta builds technologies that help people connect, find communities, and grow businesses. When Facebook launched in 2004, it changed the way people connect. Apps like Messenger, Instagram and WhatsApp further empowered billions around the world. Now, Meta is moving beyond 2D screens toward immersive experiences like augmented and virtual reality to help build the next evolution in social technology. People who choose to build their careers by building with us at Meta help shape a future that will take us beyond what digital connection makes possible today—beyond the constraints of screens, the limits of distance, and even the rules of physics.

United States of America: $123,000/year to $176,000/year + bonus + equity + benefits Individual compensation is determined by skills, qualifications, experience, and location. Compensation details listed in this posting reflect the base hourly rate, monthly rate, or annual salary only, and do not include bonus, equity or sales incentives, if applicable. In addition to base compensation, Meta offers benefits. Learn more about benefits at Meta.

Equal Employment Opportunity

Meta is proud to be an Equal Employment Opportunity employer. We do not discriminate based upon race, religion, color, national origin, sex (including pregnancy, childbirth, reproductive health decisions, or related medical conditions), sexual orientation, gender identity, gender expression, age, status as a protected veteran, status as an individual with a disability, genetic information, political views or activity, or other applicable legally protected characteristics. You may view our Equal Employment Opportunity notice here.

Meta is committed to providing reasonable accommodations for qualified individuals with disabilities and disabled veterans in our job application procedures. If you need assistance or an accommodation due to a disability, fill out the Accommodations request form.

Your next opportunity starts here

Prepare, apply, track, interview and get hired — all from one platform, with AI in your corner.

Download app

Or sponsor Premium for someone who's job hunting →