Talent Apply
Log in
All jobs
N

Mechanical Project Manager – Data Centre Construction

NSCALE
Narvik, Norway
On-site

About this role

About the Role We are seeking an experienced Mechanical Project Manager to oversee all mechanical system delivery for Nscale’s hyperscale data centre projects. You will manage the technical execution of mechanical packages from design coordination through construction, commissioning and handover. This owner-side role requires strong technical knowledge of cooling systems, HVAC, piping and plant infrastructure, ensuring mechanical works are designed, installed and commissioned to meet safety, performance and quality standards while integrating with other building systems. What You'll Do

  • Coordinate and oversee all mechanical construction activities, ensuring works meet design intent, schedule and technical standards.
  • Ensure compliance with local electrical codes, statutory requirements, applicable standards and HSE regulations relevant to the project location.
  • Review and validate design drawings, submittals, and technical documentation for constructability and compliance.
  • Manage on-site interfaces between mechanical systems and other disciplines (Electrical, Controls, CSA).
  • Monitor and report on progress, identify risks, and support schedule recovery planning across all mechanical packages, ensuring visibility and alignment across the wider delivery team.
  • Oversee quality assurance, inspections, and testing throughout installation and commissioning phases.
  • Support integrated systems testing (IST) and ensure complete verification and documentation of mechanical systems.
  • Conduct regular coordination meetings with contractors, consultants, and internal teams to maintain alignment and resolve issues.
  • Promote a culture of safety, technical excellence, and continuous improvement across all project activities. What We're Looking For
  • 7+ years’ experience managing mechanical delivery, including within data centre or mission-critical projects.
  • Degree or qualification in Mechanical or Building Services Engineering, or a related field.
  • Strong understanding of HVAC, liquid cooling, and mechanical controls (experience with AI/HPC data centers and cooling systems—including DTC, TCS, and CDU—is an advantage).
  • Proven experience in coordinating design, installation, and commissioning activities.
  • Excellent communication and stakeholder management skills.
  • Familiar with project reporting and scheduling tools.
  • Fluent in English; Norwegian advantageous. Nice to Have
  • Experience with AI/HPC data centers and cooling systems including DTC, TCS, and CDU is an advantage. Compensation & Benefits
  • Salary and benefits details not disclosed in the posting.

Your next opportunity starts here

Prepare, apply, track, interview and get hired — all from one platform, with AI in your corner.

Download app

Or sponsor Premium for someone who's job hunting →