About this role
About the role
As China SS&E Associate Director for project design management, you will play a key role in supporting China Head operation and oversees the design lifecycle of large-scale investments. You will response to ensure projects align with business goals, global standard / procedures, meet local regulation requirement including safety and environment standards, and are delivered on time and within budget. This role bridges initial feasibility study with final engineering and construction. You will work closely with all stakeholders (global and China) in project to setup project design target and timeline, and deliver design package to construction and oversight design change in project implementation.
作为中国SS&E项目设计管理的助理总监,您将在支持中国区运营方面发挥关键作用,并负责大型投资项目的设计生命周期管理。您将确保项目符合业务目标、全球标准/流程,满足当地法规要求(包括安全和环境标准),并按时按预算交付。该职位连接了初步可行性研究与最终工程和施工阶段。您将与项目中的所有利益相关者(包括全球和中国团队)紧密合作,制定项目设计目标和时间表,并将设计方案交付给施工团队,同时监督项目实施过程中的设计变更。
Your contribution:
-
Design Oversight: Manage the end-to-end design phase (from feasibility study to conceptual and basic design to detailed engineering) while ensuring it aligns with project requirements and end-user needs
-
设计监督:管理端到端的设计阶段(从可行性研究,到概念和基础设计到详细工程设计),确保其符合项目要求和最终用户需求
-
Budget Estimation & Cost Control: Prepare CAPEX budget requests, conduct feasibility studies, and apply value engineering to optimize costs without compromising quality
-
编制资本支出预算申请,开展可行性研究,并运用价值工程优化成本,同时保证质量
-
Stakeholder & Vendor Management: Coordinate cross-functional teams (engineering, procurement, and operations) and manage external partners, including architectural/engineering firms and equipment vendors
-
利益相关者与供应商管理:协调跨职能团队(工程、采购和运营),并管理外部合作伙伴,包括建筑/工程公司和设备供应商
-
Risk Management & Compliance: Identify risks early in the design phase and ensure all designs adhere to statutory regulations, HSE (Health, Safety, and Environment) policies, and industry standards
-
风险管理与合规:在设计阶段早期识别风险,并确保所有设计均符合法规、健康、安全与环境 (SHE) 政策以及行业标准
-
Develop preliminary schedules and work breakdown structures tailored to different project objectives
-
根据不同的项目目标,制定符合项目实施的初步进度计划表和工作分解表
-
Design and plan the project according to fire safety regulations and/or GxP regulations, based on different project requirements
-
根据不同的项目要求,根据消防法规和/或GxP法规要求进行项目的设计规划
-
Change Control & Handover: Manage design changes effectively, track deliverables against stage-gates, and oversee the seamless handover of the design